Dredging of stormwater pond at Tacc Dr.

The City of Mississauga is undertaking sediment removal and maintenance of Pond 5704, which is located at the southwest corner of Winston Churchill Boulevard and Tacc Drive. Construction work is expected to begin on or after May 31, and conclude by November 30, 2021....

EA begins for additional pump stations

The City of Mississauga is undertaking a Schedule B Class Environmental Assessment (Class EA) to determine the number, preferred location(s) and type(s) of pumping stations within the Lisgar District to reduce the potential for basement water infiltration. The study...

Street reconfigured to provide for trail connection

The City of Mississauga is planning to reconfigure Erin Centre Boulevard, between Tenth Line West and Oscar Peterson Boulevard, to improve the safety and comfort for all road users. Construction would start as early as July 2021. This section of Erin Centre Boulevard...

Speed limit reduced in north Churchill Meadows

The north part of Churchill Meadows is the next part of Ward 10 to undergo a speed limit reduction as part of the roll out of the Neighbourhood Area Speed Limit Project in Mississauga. Two areas are scheduled to be done concurrently and together cover the area bounded...