Standing with Indigenous Peoples

I am heartbroken by the recent discovery of a mass grave of 215 Indigenous children at a former residential school in Kamloops, BC. It is a tragic and horrific reminder of the devastating impact that the residential school system had on Indigenous youth, families and...

How to use a pedestrian crossover

The pedestrian crossovers along Churchill Meadows Boulevard (at Diviner’s Way Trail – top photo) and Osprey Boulevard (at Lisgar Meadowbrook Trail – bottom photo) are now fully installed and activated. This is a good time to remind users how to...

Dredging of stormwater pond at Tacc Dr.

The City of Mississauga is undertaking sediment removal and maintenance of Pond 5704, which is located at the southwest corner of Winston Churchill Boulevard and Tacc Drive. Construction work is expected to begin on or after May 31, and conclude by November 30, 2021....

EA begins for additional pump stations

The City of Mississauga is undertaking a Schedule B Class Environmental Assessment (Class EA) to determine the number, preferred location(s) and type(s) of pumping stations within the Lisgar District to reduce the potential for basement water infiltration. The study...

Street reconfigured to provide for trail connection

The City of Mississauga is planning to reconfigure Erin Centre Boulevard, between Tenth Line West and Oscar Peterson Boulevard, to improve the safety and comfort for all road users. Construction would start as early as July 2021. This section of Erin Centre Boulevard...