Ninth Line Widening
A major capital construction project begins. Find out more.
Ward 10
Ward 10 was first created in 2006 when the population of northwest Mississauga was growing to a point where what was then Ward 9 was the largest ward in the city. City Council approved a change that added two new wards: Ward 6 became Ward 6 and Ward 11 with minor tweaks to the boundaries of the adjacent wards, and Ward 9 became Ward 9 and Ward 10. Ward 10 is by-and-large a residential community.
Automated Speed Enforcement
Find out where the ASE cameras are enforcing speeding in Ward 10.
July 16, 2024 Flood
On July 16, Mississauga and the Greater Toronto Area experienced a catastrophic natural disaster when more than 100 mm of rain fell within a few hours, causing overland flooding and water in the basements of hundreds of homes. The page linked below provides my updates to the City’s recovery and restoration efforts.
Snow Clearing FAQ
Clearing hundreds of kilometres of roads and sidewalks in the shortest amount of time following a snow storm is quite an undertaking in our city. Click below to find a list of Frequently Asked Questions AND Answers about the City’s winter maintenance program.
Dredging of stormwater pond at Tacc Dr.
The City of Mississauga is undertaking sediment removal and maintenance of Pond 5704, which is located at the southwest corner of Winston Churchill Boulevard and Tacc Drive. Construction work is expected to begin on or after May 31, and conclude by November 30, 2021....
EA begins for additional pump stations
The City of Mississauga is undertaking a Schedule B Class Environmental Assessment (Class EA) to determine the number, preferred location(s) and type(s) of pumping stations within the Lisgar District to reduce the potential for basement water infiltration. The study...
Street reconfigured to provide for trail connection
The City of Mississauga is planning to reconfigure Erin Centre Boulevard, between Tenth Line West and Oscar Peterson Boulevard, to improve the safety and comfort for all road users. Construction would start as early as July 2021. This section of Erin Centre Boulevard...
Speed limit reduced in north Churchill Meadows
The north part of Churchill Meadows is the next part of Ward 10 to undergo a speed limit reduction as part of the roll out of the Neighbourhood Area Speed Limit Project in Mississauga. Two areas are scheduled to be done concurrently and together cover the area bounded...
Variants out-pacing vaccines in Peel’s third wave
Even as thousands of doses of COVID-19 vaccines are administered daily in Peel Region, the third wave of the pandemic rages on and residents need to adhere to stringent public health measures to keep themselves and their loved ones safe. In short, that means staying...
Connect
Sue McFadden
300 City Centre Drive Mississauga, ON L5B 3C1
Tel: 905-896-5010 Fax: 905-896-5863
Email: sue.mcfadden@mississauga.ca



